EdgeConneX / TA Realty
Tracked AI data center portfolio for EdgeConneX / TA Realty: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 324 MW
Projects
- Microsoft Union City Campus, 324 MW, Union City, GA, United States · under construction
Frequently asked questions
- How many data centers does EdgeConneX / TA Realty have?
- Data Center Index tracks 1 data center campus with EdgeConneX / TA Realty named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does EdgeConneX / TA Realty have?
- 324 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 EdgeConneX / TA Realty campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does EdgeConneX / TA Realty build data centers?
- Tracked EdgeConneX / TA Realty campuses sit in 1 market: GA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest EdgeConneX / TA Realty data center?
- Microsoft Union City Campus in GA is the largest tracked EdgeConneX / TA Realty campus at 324 MW, currently under construction. The developer or the press states that capacity, in a source dated July 19, 2024.