Meta Cheyenne
152 MW AI data center in Cheyenne, WY, United States: under construction.
- Capacity: 152 MW
- Location: Cheyenne, WY, United States
- Developer: Meta
- Status: under construction
- Estimated cost: $1.2B
Meta Cheyenne is a 152 MW AI data center project located in Cheyenne, WY, United States, currently under construction. It is being built by Meta. The estimated build cost is $1.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across WY, United States, covering operational, under-construction, announced, and permitted sites.
Notes
Users: Meta; Epoch 'Current power' = 152 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Meta Cheyenne
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Meta Platforms (META), developer · hyperscaler
- Meta Platforms (META), tenant · hyperscaler
Related data center projects
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA), 2.1 GW, Perry, OH, United States · announced
- Meta Lebanon Data Center (Project Domino), 1 GW, Lebanon, IN, United States · under construction
- Meta El Paso, 1 GW, El Paso, TX, United States · under construction
- Meta Prometheus, 1 GW, New Albany, OH, United States · operational
- Meta DeKalb Data Center, 800 MW, DeKalb, IL, United States · operational
- Meta-TerraPower Natrium Power Agreement, 690 MW, United States · announced
- Meta Altoona, Iowa AI Data Center Campus, 350 MW, Altoona, IA, United States · operational
Frequently asked questions
- What is Meta Cheyenne?
- Meta Cheyenne is an AI data center project in Cheyenne, Wyoming tracked by Data Center Index. Its status is under construction.
- Where is Meta Cheyenne?
- Meta Cheyenne is in Cheyenne, Wyoming. Every tracked Wyoming campus, with counts and capacity, is at https://datacenterindex.ai/markets/wyoming.
- How big is Meta Cheyenne?
- Data Center Index tracks Meta Cheyenne at 152 MW, on an estimated $1.2B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Meta Cheyenne?
- Meta is developing Meta Cheyenne.
- When will Meta Cheyenne come online?
- The next building at Meta Cheyenne is expected online February 15, 2027. That date is the first building going live, not the full build-out.
- Which public companies are linked to Meta Cheyenne?
- Data Center Index links 2 tracked public companies to Meta Cheyenne: Meta Platforms (META), Meta Platforms (META). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Wyoming officials say Meta's 715,000-square-foot data center is responsible for contaminating its water system with a rare bacterium (fortune.com · press · 2026-07-10)
- Cowboy State Daily (cowboystatedaily.com · press · 2026-09-20)
- Cheyenne Data Center info sheet (datacenters.atmeta.com · press · 2026-09-01)
- Cowboy State Daily (cowboystatedaily.com · press · 2026-10-07)
- Industrial Info Resources (industrialinfo.com · press · 2025-01-10)
- Industrial Info Resources (industrialinfo.com · press · 2026-05-22)
- The Epoch Times (theepochtimes.com · press · 2026-09-12)
- Meta (US locations page) (datacenters.atmeta.com · press · 2026-09-01)