Data center projects — developer=Meta
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
-
Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States (Meta) · under construction
-
Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States (Meta) · operational
-
Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States (Meta) · announced
-
Meta Prometheus — 1.1 GW, New Albany, OH, United States (Meta) · operational
-
Project Domino — 1.0 GW, Lebanon, IN, United States (Meta) · announced
-
El Paso DC — 1.0 GW, El Paso, TX, United States (Meta) · operational
-
Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States (Meta) · under construction
-
Meta — Luleå, Sweden AI Data Center Campus — 300 MW, Luleå, Sweden (Meta) · operational
-
Meta — Odense AI-Ready Data Center — 300 MW, Odense, Denmark (Meta) · operational
-
Meta — Clonee AI Data Center Campus — 288 MW, Clonee, Ireland (Meta) · operational
-
Meta Temple — 238 MW, Temple, TX, United States (Meta) · operational
-
Meta Kuna — 198 MW, Kuna ID 83634, ID, United States (Meta) · operational
-
Beaver Dam DC, Beaver Dam, WI, United States (Meta) · under construction