Project Arrowhead (Irwin County)
1.3 GW AI data center in Mystic, GA, United States: announced.
- Capacity: 1.3 GW
- Location: Mystic, GA, United States
- Developer: Premier Data Center Development, LLC
- Status: announced
- Estimated cost: $6B
Project Arrowhead (Irwin County) is a 1.3 GW AI data center project located in Mystic, GA, United States, currently announced. It is being built by Premier Data Center Development, LLC. The estimated build cost is $6B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
A Development of Regional Impact application filed with the Georgia Department of Community Affairs on April 10, 2026 describes a five-building data center campus of 4,220,000 sq ft on approximately 1,066 acres near Mystic in Irwin County, with a peak connected electrical load of 1.25 gigawatts from Georgia Power and no on-site generation. Total investment is put at up to $6 billion.
Related data center projects
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Project Arrowhead (Irwin County)?
- Project Arrowhead (Irwin County) is an AI data center project in Mystic, Georgia tracked by Data Center Index. Its status is announced.
- Where is Project Arrowhead (Irwin County)?
- Project Arrowhead (Irwin County) is in Mystic, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Project Arrowhead (Irwin County)?
- Data Center Index tracks Project Arrowhead (Irwin County) at 1.3 GW, on an estimated $6B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Project Arrowhead (Irwin County)?
- Premier Data Center Development, LLC is developing Project Arrowhead (Irwin County).