Project Arrowhead (Irwin County)
1.3 GW AI data center in Irwin County, GA, United States: permitted.
Updated
- Capacity: 1.3 GW
- Location: Irwin County, GA, United States
- Developer: Premier Data Center Development, LLC
- Status: permitted
- Estimated cost: $6B
Project Arrowhead (Irwin County) is a 1.3 GW AI data center project located in Irwin County, GA, United States, currently permitted. It is being built by Premier Data Center Development, LLC. The estimated build cost is $6B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
A Development of Regional Impact application filed with the Georgia Department of Community Affairs on April 10, 2026 describes a five-building data center campus of 4,220,000 sq ft on approximately 1,066 acres near Mystic in Irwin County, with a peak connected electrical load of 1.25 gigawatts from Georgia Power and no on-site generation. Total investment is put at up to $6 billion.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, DeSoto County, FL, United States · permitted
Frequently asked questions
- What is Project Arrowhead (Irwin County)?
- Project Arrowhead (Irwin County) is an AI data center project in Irwin County, Georgia tracked by Data Center Index. Its status is permitted.
- Where is Project Arrowhead (Irwin County)?
- Project Arrowhead (Irwin County) is in Irwin County, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Project Arrowhead (Irwin County)?
- Data Center Index tracks Project Arrowhead (Irwin County) at 1.3 GW, on an estimated $6B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Project Arrowhead (Irwin County)?
- Premier Data Center Development, LLC is developing Project Arrowhead (Irwin County).
- When will Project Arrowhead (Irwin County) come online?
- The next building at Project Arrowhead (Irwin County) is expected online 2030. That date is the first building going live, not the full build-out.
Sources
- Project Arrowhead Datacenter DRI application, Irwin County, GA (wwals.net · press · 2026-04-11)
- Videos: Datacenter Special Exception approved at Special Called Meeting of Irwin County BOCC (wwals.net · press · 2026-05-21)
- 1.2GW data center campus proposed in Irwin County, Georgia (datacenterdynamics.com · press · 2026-04-14)
- Southern Georgia Regional Commission (DRI notice) (wwals.net · press · 2026-04-24)
- apps.dca.ga.gov (public record · 2026-04-10)
- Southern Georgia Regional Commission (wwals.net · press · 2026-04-11)
- Irwin County Board of Commissioners (irwincounty-ga.gov · public record · 2026-05-21)
- Vesper (vesperosint.substack.com · press · 2026-04-16)