Eatonton 379 Data Center Campus
AI data center in Eatonton, GA, United States: announced.
Updated
- Location: Eatonton, GA, United States
- Developer: Eatonton 379, LLC
- Status: announced
Eatonton 379 Data Center Campus is an AI data center project located in Eatonton, GA, United States, currently announced. It is being built by Eatonton 379, LLC. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
Checked this session: Georgia DCA DRI #4861 (submitted by the City of Eatonton) names the project Eatonton 379, developer Eatonton 379, LLC c/o Steven L. Jones, 543 acres, 11 buildings, 3,501,600 sq ft, completion 2031 for this phase and overall; Part 2 lists +- $3.5B value at build-out and +- 520 MW peak connected electrical load (utility draw, not filed as capacity). Actions requested include rezoning, so announced.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, DeSoto County, FL, United States · permitted
Frequently asked questions
- What is Eatonton 379 Data Center Campus?
- Eatonton 379 Data Center Campus is an AI data center project in Eatonton, Georgia tracked by Data Center Index. Its status is announced.
- Where is Eatonton 379 Data Center Campus?
- Eatonton 379 Data Center Campus is in Eatonton, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- Who is building Eatonton 379 Data Center Campus?
- Eatonton 379, LLC is developing Eatonton 379 Data Center Campus.
- When will Eatonton 379 Data Center Campus come online?
- The next building at Eatonton 379 Data Center Campus is expected online 2031. That date is the first building going live, not the full build-out.
Sources
- DRI #4861 Eatonton 379, Initial DRI Information (apps.dca.ga.gov · public record · 2026-10-26)