Atlas Development Project Sail
900 MW AI data center in Newnan, GA, United States: permitted.
- Capacity: 900 MW
- Location: Newnan, GA, United States
- Developer: Atlas Development & Prologis
- Status: permitted
- Estimated cost: $17B
Atlas Development Project Sail is a 900 MW AI data center project located in Newnan, GA, United States, currently permitted. It is being built by Atlas Development & Prologis. The estimated build cost is $17B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Coweta County commissioners voted 3-2 in April 2026 to rezone 829 acres near Newnan for Project Sail, a nine-building data center campus from Atlas Development, with Prologis behind it. At about 900 MW, the site would need nearly the output of a modern nuclear reactor.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Atlas Development Project Sail?
- Atlas Development Project Sail is an AI data center project in Newnan, Georgia tracked by Data Center Index. Its status is permitted.
- Where is Atlas Development Project Sail?
- Atlas Development Project Sail is in Newnan, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Atlas Development Project Sail?
- Data Center Index tracks Atlas Development Project Sail at 900 MW, on an estimated $17B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Atlas Development Project Sail?
- Atlas Development & Prologis is developing Atlas Development Project Sail.
Sources
- AI Data Center Index facility profile: Atlas Development Project Sail Georgia (aidci · aggregator · 2026-04-29)
- Coweta County approves massive 'Project Sail' data center (fox5atlanta.com · press · 2026-04-08)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-04-09)
- Atlanta Journal-Constitution (ajc.com · press · 2026-04-08)
- DRI #4361 Project Sail, Additional DRI Information (Coweta County) (apps.dca.ga.gov · public record · 2025-01-08)
- Residents sue county government, developer over $17B data center construction (wsbtv.com · press · 2026-05-12)
- DeSmog (desmog.com · press · 2026-09-12)
- The Real Deal (therealdeal.com · press · 2026-04-08)