WI AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 4
- Operating: 1
- Under construction: 2
- Announced / permitted: 1
- Total capacity: 4.2 GW
- Estimated investment: ~$15.2B
-
Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · developer: Microsoft · tenant: OpenAI · operational · ~$14.0B
-
OpenAI Stargate Wisconsin — 1.3 GW, Port Washington, WI, United States · developer: Oracle · tenant: OpenAI · under construction
-
Beaver Dam DC — 220 MW, Beaver Dam, WI, United States · developer: Meta · under construction · ~$1.2B
-
Microsoft Kenosha (Town of Paris) Data Center, Kenosha, WI, United States · developer: Microsoft · announced