Menomonie Data Center (Balloonist LLC)
AI data center in Menomonie, WI, United States — announced.
- Location: Menomonie, WI, United States
- Developer: Balloonist LLC
- Status: announced
- Estimated cost: $1.6B
Menomonie Data Center (Balloonist LLC) is a AI data center project located in Menomonie, WI, United States, currently announced. It is being built by Balloonist LLC. The estimated build cost is $1.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across WI, United States — covering operational, under-construction, announced, and permitted sites.
Project description
A proposed $1.6 billion data center in Menomonie, filed under the name Balloonist LLC (widely reported as a shell entity for the actual developer), remains on pause while the city drafts new data-center zoning restrictions covering water/electric capacity, noise and demolition bonding.
Related data center projects
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · under construction
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus — 8.0 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus — 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion — 5.0 GW, Holly Ridge, LA, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Tract Caldwell Valley Technology Park — 4.0 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted