Serverfarm Covington Campus (Hazelbrand Road)
AI data center in Covington, GA, United States: under construction.
Updated
- Location: Covington, GA, United States
- Developer: Serverfarm
- Status: under construction
Serverfarm Covington Campus (Hazelbrand Road) is an AI data center project located in Covington, GA, United States, currently under construction. It is being built by Serverfarm. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
Checked this session: WTOC (Oct 7, 2026), citing Georgia EPD consent orders, says EPD permitted Serverfarm's Newton County data center campus on June 29, 2026 and that construction began before the permit (generators from March 9, 2026). AJC (Aug 18, 2026) independently describes 'a Covington data center under construction by the developer Serverfarm'. VoltaGrid's 90 MW is generation, not filed.
Related data center projects
- Serverfarm Clarksville Campus, 432 MW, Clarksville, AR, United States · under construction
- Serverfarm HOU1 Campus (Hockley), Hockley, TX, United States · operational
- Serverfarm HOU2 Campus (Cutten Road), Houston, TX, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
Frequently asked questions
- What is Serverfarm Covington Campus (Hazelbrand Road)?
- Serverfarm Covington Campus (Hazelbrand Road) is an AI data center project in Covington, Georgia tracked by Data Center Index. Its status is under construction.
- Where is Serverfarm Covington Campus (Hazelbrand Road)?
- Serverfarm Covington Campus (Hazelbrand Road) is in Covington, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- Who is building Serverfarm Covington Campus (Hazelbrand Road)?
- Serverfarm is developing Serverfarm Covington Campus (Hazelbrand Road).
Sources
- Ga. fines 2 companies over data center, power plant permit violations (wtoc.com · press · 2026-10-07)