Rowan Percheron Campus Boardman
300 MW AI data center in Boardman, OR, United States: announced.
Updated
- Capacity: 300 MW
- Location: Boardman, OR, United States
- Developer: Rowan Digital Infrastructure
- Status: announced
Rowan Percheron Campus Boardman is a 300 MW AI data center project located in Boardman, OR, United States, currently announced. It is being built by Rowan Digital Infrastructure. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Oregon.
Project description
Rowan's portfolio page describes Percheron as a 300 MW hyperscale campus on 275 acres, with rezoning approved in 2023, land closed in 2024 and a phased buildout targeting completion by 2030. The Hermiston Herald (Sept 10, 2023) places it 11 miles southwest of Boardman after Morrow County approved the rezoning.
Related data center projects
- Rowan Bauxite I, II & III (Quantum Frederick), 625 MW, Frederick County, MD, United States · under construction
- Rowan Project Temple, 300 MW, Temple, TX, United States · under construction
- Rowan Cinco Campus, 300 MW, Lytle, TX, United States · under construction
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Cochise Supercomputer Campus, 6 GW, Cochise, AZ, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
Frequently asked questions
- What is Rowan Percheron Campus Boardman?
- Rowan Percheron Campus Boardman is an AI data center project in Boardman, Oregon tracked by Data Center Index. Its status is announced.
- Where is Rowan Percheron Campus Boardman?
- Rowan Percheron Campus Boardman is in Boardman, Oregon. Every tracked Oregon campus, with counts and capacity, is at https://datacenterindex.ai/markets/oregon.
- How big is Rowan Percheron Campus Boardman?
- Data Center Index tracks Rowan Percheron Campus Boardman at 300 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Rowan Percheron Campus Boardman?
- Rowan Digital Infrastructure is developing Rowan Percheron Campus Boardman.
Sources
- Percheron | Rowan Digital Infrastructure (rowan.com · press · 2026-11-18)
- Hermiston Herald (hermistonherald.com · press · 2026-11-18)