Providence Digital Capital Oranda Road Campus
96 MW AI data center in Strasburg, VA, United States: announced.
- Capacity: 96 MW
- Location: Strasburg, VA, United States
- Developer: Providence Digital Capital
- Status: announced
Providence Digital Capital Oranda Road Campus is a 96 MW AI data center project located in Strasburg, VA, United States, currently announced. It is being built by Providence Digital Capital. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Providence Digital Capital is proposing a 96 MW campus of three buildings of about 150,000 sq ft each on 103 acres at 1095 Oranda Road near Strasburg, powered by on site natural gas engines with no grid connection.
Related data center projects
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital Oranda Road Campus is an AI data center project in Strasburg, Virginia tracked by Data Center Index. Its status is announced.
- Where is Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital Oranda Road Campus is in Strasburg, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is Providence Digital Capital Oranda Road Campus?
- Data Center Index tracks Providence Digital Capital Oranda Road Campus at 96 MW. The developer or the press states that capacity, in a source dated September 22, 2026.
- Who is building Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital is developing Providence Digital Capital Oranda Road Campus.
Sources
- Developer pitches data center to skeptical crowd (winchesterstar.com · press · 2026-09-22)