Providence Digital Capital Oranda Road Campus
96 MW AI data center in Strasburg, VA, United States: announced.
Updated
- Capacity: 96 MW
- Location: Strasburg, VA, United States
- Developer: Providence Digital Capital
- Status: announced
Providence Digital Capital Oranda Road Campus is a 96 MW AI data center project located in Strasburg, VA, United States, currently announced. It is being built by Providence Digital Capital. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Virginia.
Project description
Providence Digital Capital is proposing a 96 MW campus of three buildings of about 150,000 sq ft each on 103 acres at 1095 Oranda Road near Strasburg, powered by on site natural gas engines with no grid connection.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, DeSoto County, FL, United States · permitted
Frequently asked questions
- What is Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital Oranda Road Campus is an AI data center project in Strasburg, Virginia tracked by Data Center Index. Its status is announced.
- Where is Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital Oranda Road Campus is in Strasburg, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is Providence Digital Capital Oranda Road Campus?
- Data Center Index tracks Providence Digital Capital Oranda Road Campus at 96 MW. The developer or the press states that capacity, in a source dated September 22, 2026.
- Who is building Providence Digital Capital Oranda Road Campus?
- Providence Digital Capital is developing Providence Digital Capital Oranda Road Campus.
Sources
- Developer pitches data center to skeptical crowd (winchesterstar.com · press · 2026-09-22)