Monolith / Crusoe Hallam Data Center
35 MW AI data center in Hallam, NE, United States — announced.
- Capacity: 35 MW
- Location: Hallam, NE, United States
- Developer: Monolith
- Tenant: Crusoe
- Status: announced
Monolith / Crusoe Hallam Data Center is a 35 MW AI data center project located in Hallam, NE, United States, currently announced. It is being built by Monolith for tenant Crusoe. This project is one of thousands of data-center facilities tracked by Data Center Index across NE, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Hallam planning commission delayed a vote on a proposed 35 MW data center to be co-located on Monolith's existing carbon black site with partner Crusoe; ~10-acre footprint, 15 jobs; zoning amendment or special use permit still required.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted