Lakeland Equity Slavic Village Campus

150 MW AI data center in Cleveland, OH, United States: announced.

Lakeland Equity Slavic Village Campus is a 150 MW AI data center project located in Cleveland, OH, United States, currently announced. It is being built by Lakeland Equity Group. The estimated build cost is $1.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.

Project description

A $1.6 billion, 150 MW data center campus of three buildings totaling 300,000 square feet is proposed on 35 acres at 3560 E. 55th St. in Cleveland's Slavic Village, sought by Lakeland Equity Group.

Related data center projects

Frequently asked questions

What is Lakeland Equity Slavic Village Campus?
Lakeland Equity Slavic Village Campus is an AI data center project in Cleveland, Ohio tracked by Data Center Index. Its status is announced.
Where is Lakeland Equity Slavic Village Campus?
Lakeland Equity Slavic Village Campus is in Cleveland, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
How big is Lakeland Equity Slavic Village Campus?
Data Center Index tracks Lakeland Equity Slavic Village Campus at 150 MW, on an estimated $1.6B build. The developer or the press states that capacity, in a source dated May 6, 2026.
Who is building Lakeland Equity Slavic Village Campus?
Lakeland Equity Group is developing Lakeland Equity Slavic Village Campus.

Sources

  1. $1.6B data center planned in Cleveland (neo-trans.blog · press · 2026-05-06)