Fundamental Data Ridgeline Facility
2.0 GW AI data center in Thomas, WV, United States — permitted.
- Capacity: 2.0 GW
- Location: Thomas, WV, United States
- Developer: Fundamental Data
- Status: permitted
Fundamental Data Ridgeline Facility is a 2.0 GW AI data center project located in Thomas, WV, United States, currently permitted. It is being built by Fundamental Data. This project is one of thousands of data-center facilities tracked by Data Center Index across WV, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Fundamental Data's Ridgeline project on a 291-acre tract near Thomas plans ~800 MW of gas generation, ~1.3 GW of solar and 14 data center buildings using more than 2 GW of computing load, with a second phase adding 3.1 GW of gas; WVDEP issued the gas plant's air permit in Aug 2025, the Air Quality Board upheld it in Feb 2026 and WVDEP confirmed site control on Aug 13 2026.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted