CyrusOne Kincora
AI data center in Sterling, VA, United States: operational.
- Location: Sterling, VA, United States
- Developer: CyrusOne
- Status: operational
CyrusOne Kincora is a AI data center project located in Sterling, VA, United States, currently operational. It is being built by CyrusOne. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
DEQ permitted CyrusOne gen-sets at CyrusOne Kincora, 21350 Pacific Boulevard, Sterling on 2022-09-06 and lists the site as Operating; the builder DPR says it commissioned the first 9 MW data hall.
Related data center projects
- CyrusOne Sulphur Springs Data Center Campus, 3.0 GW, Sulphur Springs, TX, United States · announced
- CyrusOne Sangamon County Campus (Talkington Township), 600 MW, Waverly, IL, United States · permitted
- CyrusOne Yorkville Technology Campus, 480 MW, Yorkville, IL, United States · under construction
- CyrusOne Mesa, 198 MW, Mesa, AZ, United States · permitted
- CyrusOne Chandler (PHX1-PHX8), 169 MW, Chandler, AZ, United States · operational
- NAS Lemoore AI Data Center (Ameresco / CyrusOne), 100 MW, Lemoore, CA, United States · announced
- CyrusOne Aurora Campus, 40 MW, Aurora, IL, United States · under construction
- CyrusOne Sterling Campus (NVA1-NVA11), Sterling, VA, United States · operational