Crane Data Centers Pierce Township Campus
300 MW AI data center in Pierce Township, OH, United States: announced.
- Capacity: 300 MW
- Location: Pierce Township, OH, United States
- Developer: Crane Data Centers
- Status: announced
Crane Data Centers Pierce Township Campus is a 300 MW AI data center project located in Pierce Township, OH, United States, currently announced. It is being built by Crane Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Crane Data Centers presented a 300 MW project of three buildings on about 300 acres next to the closed Beckjord power plant to the Pierce Township Zoning Commission on September 1, 2026.
Related data center projects
- Crane PDX01 (Forest Grove), 100 MW, Forest Grove, OR, United States · under construction
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
Frequently asked questions
- What is Crane Data Centers Pierce Township Campus?
- Crane Data Centers Pierce Township Campus is an AI data center project in Pierce Township, Ohio tracked by Data Center Index. Its status is announced.
- Where is Crane Data Centers Pierce Township Campus?
- Crane Data Centers Pierce Township Campus is in Pierce Township, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Crane Data Centers Pierce Township Campus?
- Data Center Index tracks Crane Data Centers Pierce Township Campus at 300 MW. The developer or the press states that capacity, in a source dated September 2, 2026.
- Who is building Crane Data Centers Pierce Township Campus?
- Crane Data Centers is developing Crane Data Centers Pierce Township Campus.
Sources
- Small data center company eyes land near Beckjord power plant in Pierce Township (wvxu.org · press · 2026-09-02)
- WCPO (wcpo.com · press · 2026-09-02)