Bristolville 25 Lordstown Data Center
AI data center in Lordstown, OH, United States: paused.
Updated
- Location: Lordstown, OH, United States
- Developer: Bristolville 25 Developer
- Status: paused
- Estimated cost: $3.6B
Status: Paused
No megawatt figure published. Lordstown adopted a ban on data centers in November 2025, converted it to a moratorium in January 2026 and extended that moratorium in July 2026 to January 2027. On October 20, 2026 the Supreme Court of Ohio ruled the village does not have to review the developer's site plan, which was filed days before the ban (WKBN). Source: WKBN, 2026-10-20.
Paused and cancelled projects stay listed in the directory but are not counted in state totals, capacity totals or rankings.
Bristolville 25 Lordstown Data Center is an AI data center project located in Lordstown, OH, United States, currently paused. It was being developed by Bristolville 25 Developer. The estimated build cost is $3.6B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Ohio.
Project description
A developer proposed a $3.6 billion data center on 133 acres off state Route 45 in Lordstown and North Jackson, straddling the Trumbull and Mahoning county line, with about 1,600 construction jobs and 120 permanent positions.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, DeSoto County, FL, United States · permitted
Frequently asked questions
- What is Bristolville 25 Lordstown Data Center?
- Bristolville 25 Lordstown Data Center is an AI data center project in Lordstown, Ohio tracked by Data Center Index. Its status is paused. A paused campus stays listed with its source, but is never counted in state totals, capacity totals or rankings.
- Where is Bristolville 25 Lordstown Data Center?
- Bristolville 25 Lordstown Data Center is in Lordstown, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- Who is building Bristolville 25 Lordstown Data Center?
- Bristolville 25 Developer was developing Bristolville 25 Lordstown Data Center.
Sources
- Company Proposes $3.6B Data Center in Lordstown (businessjournaldaily.com · press · 2025-10-29)
- SUPCO: Lordstown can reject data center proposed before moratorium (wkbn.com · press · 2026-10-20)
- Marysville Journal-Tribune (marysvillejt.com · press · 2026-10-20)