Atlas Development Project Springbank (Adairsville)
432 MW AI data center in Adairsville, GA, United States: announced.
- Capacity: 432 MW
- Location: Adairsville, GA, United States
- Developer: Atlas Development
- Status: announced
- Estimated cost: $4.5B
Atlas Development Project Springbank (Adairsville) is a 432 MW AI data center project located in Adairsville, GA, United States, currently announced. It is being built by Atlas Development. The estimated build cost is $4.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Preliminary plans disclosed on February 14, 2025 show a six-building data center campus on 588 acres near Horseshoe Loop and Barnsley Gardens Road southeast of Adairsville in Bartow County. Each building would span 379,000 sq ft and the campus would total 432 megawatts, with a $4.5 billion investment and completion estimated by late 2031.
Related data center projects
- Atlas Development Social Circle (Hawkins Academy Road), Social Circle, GA, United States · permitted
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
Frequently asked questions
- What is Atlas Development Project Springbank (Adairsville)?
- Atlas Development Project Springbank (Adairsville) is an AI data center project in Adairsville, Georgia tracked by Data Center Index. Its status is announced.
- Where is Atlas Development Project Springbank (Adairsville)?
- Atlas Development Project Springbank (Adairsville) is in Adairsville, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Atlas Development Project Springbank (Adairsville)?
- Data Center Index tracks Atlas Development Project Springbank (Adairsville) at 432 MW, on an estimated $4.5B build. The developer or the press states that capacity, in a source dated February 17, 2025.
- Who is building Atlas Development Project Springbank (Adairsville)?
- Atlas Development is developing Atlas Development Project Springbank (Adairsville).
Sources
- $4.5B 'Project Springbank' joins metro Atlanta's data center pipeline (ajc.com · press · 2025-02-17)