xAI QTS Atlanta
17 MW AI computing site in Atlanta, GA, United States: operational.
Updated
- Capacity: 17 MW
- Location: Atlanta, GA, United States
- Developer: QTS Data Centers
- Tenant: X Corp / xAI
- Status: operational
- Estimated cost: $0.7B
xAI QTS Atlanta is a 17 MW AI computing site located in Atlanta, GA, United States, currently operational. It was developed by QTS Data Centers for tenant X Corp / xAI. The estimated build cost is $0.7B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Notes
Users: SpaceXAI; Epoch 'Current power' = 17 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to xAI QTS Atlanta
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- SpaceXAI (SPCX), developer · ai lab
- SpaceXAI (SPCX), tenant · ai lab
Related data center projects
- QTS Blakely Campus (Early County), 1.4 GW, Blakely, GA, United States · announced
- Project Marvel (QTS Bessemer), 1.2 GW, Bessemer, AL, United States · under construction
- QTS Phoenix 3 (Glendale C|303), 750 MW, Glendale, AZ, United States · announced
- Microsoft Fairwater Atlanta, 636 MW, Fayetteville, GA, United States · operational
- QTS Van Wert Campus, 500 MW, Van Wert, OH, United States · under construction
- QTS Atlanta 1 Campus (Jefferson Street), 278 MW, Atlanta, GA, United States · operational
- QTS Richmond 3, 240 MW, Sandston, VA, United States · operational
- QTS Richmond 1, 238 MW, Sandston, VA, United States · operational
Frequently asked questions
- What is xAI QTS Atlanta?
- xAI QTS Atlanta is an AI compute deployment that is not a standalone campus in Atlanta, Georgia tracked by Data Center Index. Its status is operational.
- Where is xAI QTS Atlanta?
- xAI QTS Atlanta is in Atlanta, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is xAI QTS Atlanta?
- Data Center Index tracks xAI QTS Atlanta at 17 MW, on an estimated $0.7B build. That capacity is an estimate. We modeled or inferred it, and no source states it. This entry is not a standalone campus, so it is left out of campus counts and capacity totals.
- Who is building xAI QTS Atlanta?
- QTS Data Centers is developing xAI QTS Atlanta, with X Corp / xAI named as the tenant.
- Which public companies are linked to xAI QTS Atlanta?
- Data Center Index links 2 tracked public companies to xAI QTS Atlanta: SpaceXAI (SPCX), SpaceXAI (SPCX). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Fortune (fortune.com · press · 2025-01-24)
- xAI QTS Atlanta | AI Data Centers (epoch.ai · aggregator · 2026-09-11)
- Teslarati (teslarati.com · press · 2025-01-24)