Vantage Johannesburg I (JNB1) Campus
80 MW AI data center in Midrand, South Africa: operational.
- Capacity: 80 MW
- Location: Midrand, South Africa
- Developer: Vantage Data Centers
- Status: operational
Vantage Johannesburg I (JNB1) Campus is a 80 MW AI data center project located in Midrand, South Africa, currently operational. It is being built by Vantage Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across South Africa, covering operational, under-construction, announced, and permitted sites.
Project description
TechCentral reports Vantage opened its first building at the JNB1 campus in Midrand, a 16 MW data centre, and plans 80 MW in total there, with the next phase under construction.
Public companies linked to Vantage Johannesburg I (JNB1) Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Vantage Data Centers (VANTAGE), developer · dc operator
Related data center projects
- OpenAI Stargate Shackelford, 1.4 GW, Shackelford County, TX, United States · under construction
- OpenAI Stargate Wisconsin, 902 MW, Port Washington, WI, United States · under construction
- Vantage OH2 Millersport Campus, 696 MW, Millersport, OH, United States · under construction
- Vantage Wyoming Campus (Project Latigo), 480 MW, Laramie County, WY, United States · permitted
- Vantage Trident Data Center, 334 MW, Aurora, CO, United States · announced
- Vantage Nevada AI Data Center (NV1), 224 MW, Storey County, NV, United States · under construction
- Vantage OH1 New Albany Campus, 192 MW, New Albany, OH, United States · under construction
- Vantage VA4 (Stafford), 192 MW, Stafford County, VA, United States · under construction
Frequently asked questions
- What is Vantage Johannesburg I (JNB1) Campus?
- Vantage Johannesburg I (JNB1) Campus is an AI data center project in Midrand, South Africa tracked by Data Center Index. Its status is operational.
- Where is Vantage Johannesburg I (JNB1) Campus?
- Vantage Johannesburg I (JNB1) Campus is in Midrand, South Africa.
- How big is Vantage Johannesburg I (JNB1) Campus?
- Data Center Index tracks Vantage Johannesburg I (JNB1) Campus at 80 MW. 16 MW of that is live today. The developer or the press states that capacity, in a source dated December 13, 2022.
- Who is building Vantage Johannesburg I (JNB1) Campus?
- Vantage Data Centers is developing Vantage Johannesburg I (JNB1) Campus.
- Which public companies are linked to Vantage Johannesburg I (JNB1) Campus?
- Data Center Index links 1 tracked public company to Vantage Johannesburg I (JNB1) Campus: Vantage Data Centers (VANTAGE). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Vantage to build second Joburg data centre campus (techcentral.co.za · press · 2022-12-13)