Novva Mesa
300 MW AI data center in Mesa, AZ, United States — announced.
- Capacity: 300 MW
- Location: Mesa, AZ, United States
- Developer: Novva Data Centers
- Status: announced
- Estimated cost: $3.0B
Novva Mesa is a 300 MW AI data center project located in Mesa, AZ, United States, currently announced. It is being built by Novva Data Centers. The estimated build cost is $3.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across AZ, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Novva plans a 300 MW, 160-acre campus at Ellsworth and Warner roads in southeast Mesa, investing more than $3B over two phases; a 96 MW first phase is scheduled to deliver in late 2026.
Related data center projects
- Novva West Jordan (Salt Lake City campus) — 200 MW, West Jordan, UT, United States · operational
- Novva North Las Vegas — 100 MW, North Las Vegas, NV, United States · operational
- Novva Tahoe Reno — 60 MW, McCarran, NV, United States · operational
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction