Meta Bowling Green Data Center
350 MW AI data center in Middleton Township (Bowling Green), OH, United States — under construction.
- Capacity: 350 MW
- Location: Middleton Township (Bowling Green), OH, United States
- Developer: Meta
- Status: under construction
- Estimated cost: $0.8B
Meta Bowling Green Data Center is a 350 MW AI data center project located in Middleton Township (Bowling Green), OH, United States, currently under construction. It is being built by Meta. The estimated build cost is $0.8B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Meta's $800M data center is under construction in Middleton Township about five miles north of Bowling Green with roughly 1,000 construction workers on site, ~100 operational jobs planned, $28M in road/water infrastructure and a Meta-built 2 million gallon water tank.
Related data center projects
- Meta Hyperion — 2.3 GW, Holly Ridge, LA, United States · under construction
- Meta–Vistra Nuclear Uprate Agreement (OH/PA) — 2.1 GW, Perry, OH, United States · announced
- Meta Prometheus — 1.1 GW, New Albany, OH, United States · operational
- Project Domino — 1.0 GW, Lebanon, IN, United States · under construction
- El Paso DC — 1.0 GW, El Paso, TX, United States · under construction
- Meta AI Training Campus (Cortland, Illinois) — 800 MW, Cortland, IL, United States · under construction
- Meta-TerraPower Natrium Power Agreement — 690 MW, United States · announced
- Meta Montgomery — 465 MW, Co Rd 42, AL, United States · operational