Data center projects — country=South Korea
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
-
Stock Farm Road 3 GW AI Data Center (South Korea) — 3.0 GW, Muan County (planned), South Korea (Stock Farm Road) · announced
-
SK Group–AWS Ulsan AI Data Center (South Korea) — 1.0 GW, Ulsan, South Korea (SK Group) · announced
-
Amazon Web Services — Seoul Region (AP Northeast 2) — 250 MW, Seoul, South Korea (Amazon Web Services) · operational
-
Naver — Chuncheon Data Center (Gak) — 100 MW, Chuncheon, South Korea (Naver) · operational
-
Kakao — KakaoCloud AI Data Center — 80 MW, Ansan, South Korea (Kakao) · operational
-
Naver — B200 4K AI Cluster — 40 MW, Sejong, South Korea (Naver Cloud) · operational
-
Pyeongtaek P4, Pyeongtaek, South Korea, South Korea (Samsung) · under construction
-
M15X HBM Fab, Cheongju, South Korea, South Korea (SK Hynix) · under construction