Kraft Group Sutton Data Center Campus
900 MW AI data center in Sutton, MA, United States: announced.
Updated
- Capacity: 900 MW
- Location: Sutton, MA, United States
- Developer: The Kraft Group
- Status: announced
- Estimated cost: $16B
Kraft Group Sutton Data Center Campus is a 900 MW AI data center project located in Sutton, MA, United States, currently announced. It is being built by The Kraft Group. The estimated build cost is $16B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Massachusetts.
Project description
The Boston Globe reports the Kraft Group and Unified Global Packaging Group propose a $16 billion, 10-building campus in Sutton drawing 900 MW when completed in 2033, with the first two buildings opening in 2029. WBUR (2026-11-17) confirms 10 buildings and 900 MW and says the town calls the proposal tentative with no applications filed yet.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- New Era Energy & Digital Lea County AI Campus, 7 GW, Caprock, NM, United States · announced
- Cochise Supercomputer Campus, 6 GW, Cochise, AZ, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Related Digital La Salle County Campus, 5 GW, La Salle County, TX, United States · announced
Frequently asked questions
- What is Kraft Group Sutton Data Center Campus?
- Kraft Group Sutton Data Center Campus is an AI data center project in Sutton, Massachusetts tracked by Data Center Index. Its status is announced.
- Where is Kraft Group Sutton Data Center Campus?
- Kraft Group Sutton Data Center Campus is in Sutton, Massachusetts. Every tracked Massachusetts campus, with counts and capacity, is at https://datacenterindex.ai/markets/massachusetts.
- How big is Kraft Group Sutton Data Center Campus?
- Data Center Index tracks Kraft Group Sutton Data Center Campus at 900 MW, on an estimated $16B build. The developer or the press states that capacity, in a source dated November 10, 2026.
- Who is building Kraft Group Sutton Data Center Campus?
- The Kraft Group is developing Kraft Group Sutton Data Center Campus.
- When will Kraft Group Sutton Data Center Campus come online?
- The next building at Kraft Group Sutton Data Center Campus is expected online 2029. That date is the first building going live, not the full build-out.
Sources
- Kraft Group data centers in Sutton, Mass. (bostonglobe.com · press · 2026-11-10)
- WBUR (wbur.org · press · 2026-11-10)