Kraft Group Sutton Data Center Campus

900 MW AI data center in Sutton, MA, United States: announced.

Updated

Kraft Group Sutton Data Center Campus is a 900 MW AI data center project located in Sutton, MA, United States, currently announced. It is being built by The Kraft Group. The estimated build cost is $16B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Massachusetts.

Project description

The Boston Globe reports the Kraft Group and Unified Global Packaging Group propose a $16 billion, 10-building campus in Sutton drawing 900 MW when completed in 2033, with the first two buildings opening in 2029. WBUR (2026-11-17) confirms 10 buildings and 900 MW and says the town calls the proposal tentative with no applications filed yet.

Related data center projects

Frequently asked questions

What is Kraft Group Sutton Data Center Campus?
Kraft Group Sutton Data Center Campus is an AI data center project in Sutton, Massachusetts tracked by Data Center Index. Its status is announced.
Where is Kraft Group Sutton Data Center Campus?
Kraft Group Sutton Data Center Campus is in Sutton, Massachusetts. Every tracked Massachusetts campus, with counts and capacity, is at https://datacenterindex.ai/markets/massachusetts.
How big is Kraft Group Sutton Data Center Campus?
Data Center Index tracks Kraft Group Sutton Data Center Campus at 900 MW, on an estimated $16B build. The developer or the press states that capacity, in a source dated November 10, 2026.
Who is building Kraft Group Sutton Data Center Campus?
The Kraft Group is developing Kraft Group Sutton Data Center Campus.
When will Kraft Group Sutton Data Center Campus come online?
The next building at Kraft Group Sutton Data Center Campus is expected online 2029. That date is the first building going live, not the full build-out.