Expedient DEN1 Centennial
2 MW AI data center in Centennial, CO, United States: operational.
Updated
- Capacity: 2 MW
- Location: Centennial, CO, United States
- Developer: Expedient
- Status: operational
Expedient DEN1 Centennial is a 2 MW AI data center project located in Centennial, CO, United States, currently operational. It was developed by Expedient. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Colorado.
Project description
Expedient's Centennial data center page lists DEN1 at 7347 S. Revere Parkway Building C, Centennial, CO 80112 and states: 1.6 MW Critical IT Load. Critical IT load is the operator's own measure.
Related data center projects
- Expedient CMH3 Lewis Center, 7 MW, Lewis Center, OH, United States · operational
- Expedient Cleveland Campus (CLE1, CLE2), 5 MW, Cleveland, OH, United States · operational
- Expedient IND1 Carmel, 4 MW, Carmel, IN, United States · operational
- Expedient PHX1 Phoenix, 4 MW, Phoenix, AZ, United States · operational
- Expedient BWI1 Baltimore (Owings Mills), 2 MW, Owings Mills, MD, United States · operational
- Expedient MKE1 Franklin, 2 MW, Franklin, WI, United States · operational
- Expedient MEM1 Memphis, 2 MW, Memphis, TN, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
Frequently asked questions
- What is Expedient DEN1 Centennial?
- Expedient DEN1 Centennial is an AI data center project in Centennial, Colorado tracked by Data Center Index. Its status is operational.
- Where is Expedient DEN1 Centennial?
- Expedient DEN1 Centennial is in Centennial, Colorado. Every tracked Colorado campus, with counts and capacity, is at https://datacenterindex.ai/markets/colorado.
- How big is Expedient DEN1 Centennial?
- Data Center Index tracks Expedient DEN1 Centennial at 2 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Expedient DEN1 Centennial?
- Expedient is developing Expedient DEN1 Centennial.
Sources
- Centennial Data Center | Expedient (expedient.com · press · 2026-11-18)