Expedient CMH3 Lewis Center
7 MW AI data center in Lewis Center, OH, United States: operational.
Updated
- Capacity: 7 MW
- Location: Lewis Center, OH, United States
- Developer: Expedient
- Status: operational
Expedient CMH3 Lewis Center is a 7 MW AI data center project located in Lewis Center, OH, United States, currently operational. It was developed by Expedient. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Ohio.
Project description
Expedient's Columbus page lists CMH3 at 281 E. Powell Road, Lewis Center with 7 MW and 102,000 sq ft; the three Columbus sites total 13.4 MW of critical IT load, which sums with 4.8 MW for CMH2 and 1.6 MW for CMH1. The per-site MW column is read as critical IT load because the sites add to the stated total.
Related data center projects
- Expedient Cleveland Campus (CLE1, CLE2), 5 MW, Cleveland, OH, United States · operational
- Expedient IND1 Carmel, 4 MW, Carmel, IN, United States · operational
- Expedient PHX1 Phoenix, 4 MW, Phoenix, AZ, United States · operational
- Expedient BWI1 Baltimore (Owings Mills), 2 MW, Owings Mills, MD, United States · operational
- Expedient DEN1 Centennial, 2 MW, Centennial, CO, United States · operational
- Expedient MKE1 Franklin, 2 MW, Franklin, WI, United States · operational
- Expedient MEM1 Memphis, 2 MW, Memphis, TN, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
Frequently asked questions
- What is Expedient CMH3 Lewis Center?
- Expedient CMH3 Lewis Center is an AI data center project in Lewis Center, Ohio tracked by Data Center Index. Its status is operational.
- Where is Expedient CMH3 Lewis Center?
- Expedient CMH3 Lewis Center is in Lewis Center, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Expedient CMH3 Lewis Center?
- Data Center Index tracks Expedient CMH3 Lewis Center at 7 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Expedient CMH3 Lewis Center?
- Expedient is developing Expedient CMH3 Lewis Center.
Sources
- Lewis Center Data Center | Expedient (expedient.com · press · 2026-11-18)