Expedient CMH3 Lewis Center

7 MW AI data center in Lewis Center, OH, United States: operational.

Updated

Expedient CMH3 Lewis Center is a 7 MW AI data center project located in Lewis Center, OH, United States, currently operational. It was developed by Expedient. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Ohio.

Project description

Expedient's Columbus page lists CMH3 at 281 E. Powell Road, Lewis Center with 7 MW and 102,000 sq ft; the three Columbus sites total 13.4 MW of critical IT load, which sums with 4.8 MW for CMH2 and 1.6 MW for CMH1. The per-site MW column is read as critical IT load because the sites add to the stated total.

Related data center projects

Frequently asked questions

What is Expedient CMH3 Lewis Center?
Expedient CMH3 Lewis Center is an AI data center project in Lewis Center, Ohio tracked by Data Center Index. Its status is operational.
Where is Expedient CMH3 Lewis Center?
Expedient CMH3 Lewis Center is in Lewis Center, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
How big is Expedient CMH3 Lewis Center?
Data Center Index tracks Expedient CMH3 Lewis Center at 7 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
Who is building Expedient CMH3 Lewis Center?
Expedient is developing Expedient CMH3 Lewis Center.

Sources

  1. Lewis Center Data Center | Expedient (expedient.com · press · 2026-11-18)