Expedient
Tracked AI data center portfolio for Expedient: campuses, partners and project map.
- Projects tracked: 8
- Total pipeline: 27 MW
Projects
- Expedient CMH3 Lewis Center, 7 MW, Lewis Center, OH, United States · operational
- Expedient Cleveland Campus (CLE1, CLE2), 5 MW, Cleveland, OH, United States · operational
- Expedient IND1 Carmel, 4 MW, Carmel, IN, United States · operational
- Expedient PHX1 Phoenix, 4 MW, Phoenix, AZ, United States · operational
- Expedient BWI1 Baltimore (Owings Mills), 2 MW, Owings Mills, MD, United States · operational
- Expedient DEN1 Centennial, 2 MW, Centennial, CO, United States · operational
- Expedient MKE1 Franklin, 2 MW, Franklin, WI, United States · operational
- Expedient MEM1 Memphis, 2 MW, Memphis, TN, United States · operational
Frequently asked questions
- How many data centers does Expedient have?
- Data Center Index tracks 8 data center campuses with Expedient named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Expedient have?
- 27 MW across 8 tracked campuses, counting operating and pipeline sites together. Of the 8 Expedient campuses with a capacity figure, 0 are filed, 8 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Expedient build data centers?
- Tracked Expedient campuses sit in 7 markets: OH (2), AZ (1), CO (1), IN (1), MD (1), TN (1), WI (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Expedient data center?
- Expedient CMH3 Lewis Center in OH is the largest tracked Expedient campus at 7 MW, currently operational. The developer or the press states that capacity, in a source dated November 18, 2026.