DataBank ORD4 Oak Brook
9 MW AI data center in Oak Brook, IL, United States: operational.
Updated
- Capacity: 9 MW
- Location: Oak Brook, IL, United States
- Developer: DataBank
- Status: operational
DataBank ORD4 Oak Brook is a 9 MW AI data center project located in Oak Brook, IL, United States, currently operational. It was developed by DataBank. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Illinois.
Project description
DataBank's own ORD4 page gives the address as 1808 Swift Drive, Suite B & C, Oak Brook, IL 60523 and lists 8.75 MW of critical IT load.
Related data center projects
- DataBank Red Oak Campus, 480 MW, Red Oak, TX, United States · under construction
- DataBank Project Indo (Cartersville), 200 MW, Cartersville, GA, United States · announced
- DataBank Culpeper Campus, 192 MW, Culpeper County, VA, United States · under construction
- DataBank Lithia Springs Campus (ATL5 and ATL6), 120 MW, South Fulton, GA, United States · under construction
- DataBank / Goodman Vernon Data Center, 32 MW, Vernon, CA, United States · under construction
- DataBank MCI3 Lenexa South Lake, 13 MW, Lenexa, KS, United States · operational
- DataBank MSP3 Brooklyn Park, 9 MW, Brooklyn Park, MN, United States · operational
- DataBank SNA2 Irvine, 8 MW, Irvine, CA, United States · operational
Frequently asked questions
- What is DataBank ORD4 Oak Brook?
- DataBank ORD4 Oak Brook is an AI data center project in Oak Brook, Illinois tracked by Data Center Index. Its status is operational.
- Where is DataBank ORD4 Oak Brook?
- DataBank ORD4 Oak Brook is in Oak Brook, Illinois. Every tracked Illinois campus, with counts and capacity, is at https://datacenterindex.ai/markets/illinois.
- How big is DataBank ORD4 Oak Brook?
- Data Center Index tracks DataBank ORD4 Oak Brook at 9 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building DataBank ORD4 Oak Brook?
- DataBank is developing DataBank ORD4 Oak Brook.
Sources
- Chicago Tri-State Data Center (ORD4) (databank.com · press · 2026-11-18)