Teraco Isando Campus (JB1, JB3, JB5)
70 MW AI data center in Isando, South Africa: operational.
- Capacity: 70 MW
- Location: Isando, South Africa
- Developer: Teraco (Digital Realty)
- Status: operational
Teraco Isando Campus (JB1, JB3, JB5) is a 70 MW AI data center project located in Isando, South Africa, currently operational. It is being built by Teraco (Digital Realty). This project is one of thousands of data-center facilities tracked by Data Center Index across South Africa, covering operational, under-construction, announced, and permitted sites.
Project description
Teraco's November 2025 release lists its Isando Campus (JB1, JB3, JB5) at 70 MW of critical power load. Its November 2024 release said JB7, a 40 MW building at the same campus, was under construction for 2026 completion.
Public companies linked to Teraco Isando Campus (JB1, JB3, JB5)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Digital Realty (DLR), developer · dc operator · high DC exposure
Related data center projects
- Teraco Bredell Campus (JB2, JB4), 64 MW, Bredell, South Africa · operational
- Teraco CT2 Cape Town (Brackenfell), 50 MW, Brackenfell, South Africa · operational
- Cavaleros Cape Town Data Centre Campus, 360 MW, Cape Town, South Africa · announced
- Cosmas Data City Samrand, 200 MW, Samrand, South Africa · announced
- Equinix Cape Town Airport Campus (King David Golf Club site), 160 MW, Cape Town, South Africa · announced
- AWS Africa (Cape Town) af-south-1, 120 MW, Cape Town, South Africa · operational
- Microsoft Azure South Africa AI Region, 80 MW, Johannesburg, South Africa · operational
- Vantage Johannesburg I (JNB1) Campus, 80 MW, Midrand, South Africa · operational
Frequently asked questions
- What is Teraco Isando Campus (JB1, JB3, JB5)?
- Teraco Isando Campus (JB1, JB3, JB5) is an AI data center project in Isando, South Africa tracked by Data Center Index. Its status is operational.
- Where is Teraco Isando Campus (JB1, JB3, JB5)?
- Teraco Isando Campus (JB1, JB3, JB5) is in Isando, South Africa.
- How big is Teraco Isando Campus (JB1, JB3, JB5)?
- Data Center Index tracks Teraco Isando Campus (JB1, JB3, JB5) at 70 MW. The developer or the press states that capacity, in a source dated November 12, 2025.
- Who is building Teraco Isando Campus (JB1, JB3, JB5)?
- Teraco (Digital Realty) is developing Teraco Isando Campus (JB1, JB3, JB5).
- Which public companies are linked to Teraco Isando Campus (JB1, JB3, JB5)?
- Data Center Index links 1 tracked public company to Teraco Isando Campus (JB1, JB3, JB5): Digital Realty (DLR). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Teraco announces CT1 data centre expansion in Rondebosch, Cape Town (teraco.co.za · press · 2025-11-12)
- Teraco (teraco.co.za · press · 2025-11-12)