Teraco Bredell Campus (JB2, JB4)
64 MW AI data center in Bredell, South Africa: operational.
- Capacity: 64 MW
- Location: Bredell, South Africa
- Developer: Teraco (Digital Realty)
- Status: operational
Teraco Bredell Campus (JB2, JB4) is a 64 MW AI data center project located in Bredell, South Africa, currently operational. It is being built by Teraco (Digital Realty). This project is one of thousands of data-center facilities tracked by Data Center Index across South Africa, covering operational, under-construction, announced, and permitted sites.
Project description
Teraco's November 2025 release lists the Bredell Campus (JB2 and JB4, east of Johannesburg in Ekurhuleni) at 64 MW of critical power load.
Public companies linked to Teraco Bredell Campus (JB2, JB4)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Digital Realty (DLR), developer · dc operator · high DC exposure
Related data center projects
- Teraco Isando Campus (JB1, JB3, JB5), 70 MW, Isando, South Africa · operational
- Teraco CT2 Cape Town (Brackenfell), 50 MW, Brackenfell, South Africa · operational
- Cavaleros Cape Town Data Centre Campus, 360 MW, Cape Town, South Africa · announced
- Cosmas Data City Samrand, 200 MW, Samrand, South Africa · announced
- Equinix Cape Town Airport Campus (King David Golf Club site), 160 MW, Cape Town, South Africa · announced
- AWS Africa (Cape Town) af-south-1, 120 MW, Cape Town, South Africa · operational
- Microsoft Azure South Africa AI Region, 80 MW, Johannesburg, South Africa · operational
- Vantage Johannesburg I (JNB1) Campus, 80 MW, Midrand, South Africa · operational
Frequently asked questions
- What is Teraco Bredell Campus (JB2, JB4)?
- Teraco Bredell Campus (JB2, JB4) is an AI data center project in Bredell, South Africa tracked by Data Center Index. Its status is operational.
- Where is Teraco Bredell Campus (JB2, JB4)?
- Teraco Bredell Campus (JB2, JB4) is in Bredell, South Africa.
- How big is Teraco Bredell Campus (JB2, JB4)?
- Data Center Index tracks Teraco Bredell Campus (JB2, JB4) at 64 MW. The developer or the press states that capacity, in a source dated November 12, 2025.
- Who is building Teraco Bredell Campus (JB2, JB4)?
- Teraco (Digital Realty) is developing Teraco Bredell Campus (JB2, JB4).
- Which public companies are linked to Teraco Bredell Campus (JB2, JB4)?
- Data Center Index links 1 tracked public company to Teraco Bredell Campus (JB2, JB4): Digital Realty (DLR). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Teraco announces CT1 data centre expansion in Rondebosch, Cape Town (teraco.co.za · press · 2025-11-12)