Iron Mountain AZS-1 Scottsdale
6 MW AI data center in Scottsdale, AZ, United States: operational.
Updated
- Capacity: 6 MW
- Location: Scottsdale, AZ, United States
- Developer: Iron Mountain
- Status: operational
Iron Mountain AZS-1 Scottsdale is a 6 MW AI data center project located in Scottsdale, AZ, United States, currently operational. It was developed by Iron Mountain. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Arizona.
Project description
Iron Mountain's AZS-1 page gives 8521 E Princess Drive, Scottsdale, AZ, 121,000 sq ft on a 4.5-acre campus with 5.8 MW in a 2N configuration, expandable to 9.6 MW.
Public companies linked to Iron Mountain AZS-1 Scottsdale
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Iron Mountain (IRM), developer · dc operator
Related data center projects
- Iron Mountain Manassas Campus (VA-1 to VA-7), 400 MW, Manassas, VA, United States · operational
- Iron Mountain Richmond Campus (RCH, White Oak Technology Park), 200 MW, Sandston, VA, United States · permitted
- Iron Mountain Phoenix Campus (AZP-1/AZP-2), 89 MW, Phoenix, AZ, United States · operational
- Iron Mountain CHI-1 Des Plaines, 36 MW, Des Plaines, IL, United States · operational
- Iron Mountain NJE-1 Edison, 30 MW, Edison, NJ, United States · operational
- Iron Mountain MIA-1 Miami Data Center, 16 MW, Miami, FL, United States · under construction
- Iron Mountain WPA-1 Boyers, 16 MW, Boyers, PA, United States · operational
- Iron Mountain DEN-1 Denver, 14 MW, Denver, CO, United States · operational
Frequently asked questions
- What is Iron Mountain AZS-1 Scottsdale?
- Iron Mountain AZS-1 Scottsdale is an AI data center project in Scottsdale, Arizona tracked by Data Center Index. Its status is operational.
- Where is Iron Mountain AZS-1 Scottsdale?
- Iron Mountain AZS-1 Scottsdale is in Scottsdale, Arizona. Every tracked Arizona campus, with counts and capacity, is at https://datacenterindex.ai/markets/arizona.
- How big is Iron Mountain AZS-1 Scottsdale?
- Data Center Index tracks Iron Mountain AZS-1 Scottsdale at 6 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building Iron Mountain AZS-1 Scottsdale?
- Iron Mountain is developing Iron Mountain AZS-1 Scottsdale.
- Which public companies are linked to Iron Mountain AZS-1 Scottsdale?
- Data Center Index links 1 tracked public company to Iron Mountain AZS-1 Scottsdale: Iron Mountain (IRM). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- AZS-1 Scottsdale data center | Iron Mountain Data Centers (ironmountain.com · press · 2026-11-18)