Google Lima Data Center (Project Bosc)
AI data center in American Township (Lima), OH, United States — under construction.
- Location: American Township (Lima), OH, United States
- Developer: Google
- Status: under construction
- Estimated cost: $0.5B
Google Lima Data Center (Project Bosc) is a AI data center project located in American Township (Lima), OH, United States, currently under construction. It is being built by Google. The estimated build cost is $0.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Google's $500M data center is under construction on 373 acres in American Township about seven miles northwest of Lima, with 115 gas-fired backup generators, a 20-year water agreement with the City of Lima (5-10 million gallons/day) and a 75% property tax abatement for 15 years.
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Google Project Tembo (Cheyenne) — 2.7 GW, Cheyenne, WY, United States · announced
- Goodnight — 1.3 GW, Claude, TX, United States · under construction
- Google Morgan County Data Center (Project Louie) — 1.2 GW, Monrovia, IN, United States · under construction
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · operational
- EcoDataCenter 1 — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced