Google Cloud Malaysia AI Data Center (Johor Bahru)
220 MW AI data center in Johor Bahru, Malaysia — under construction.
- Capacity: 220 MW
- Location: Johor Bahru, Malaysia
- Developer: Google
- Status: under construction
- Energy source: Grid with renewable energy targets
Google Cloud Malaysia AI Data Center (Johor Bahru) is a 220 MW AI data center project located in Johor Bahru, Malaysia, currently under construction. It is being built by Google. Power for the facility is sourced from Grid with renewable energy targets. This project is one of thousands of data-center facilities tracked by Data Center Index across Malaysia — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Google Cloud Malaysia AI Data Center (Johor Bahru)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.1 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google Cedar Rapids — 627 MW, IA 52404, IA, United States · operational
- Google New Albany — 543 MW, New Albany, OH, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, United States · announced