DayOne Kempas
422 MW AI data center in HP79+MP, Malaysia: operational.
- Capacity: 422 MW
- Location: HP79+MP, Malaysia
- Status: operational
- Estimated cost: $12.2B
DayOne Kempas is a 422 MW AI data center project located in HP79+MP, Malaysia, currently operational.. The estimated build cost is $12.2B. This project is one of thousands of data-center facilities tracked by Data Center Index across Malaysia, covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 322 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- Oracle — Malaysia Public Cloud Region, 500 MW, Kuala Lumpur, Malaysia · operational
- AWS Malaysia Cloud Region (Cyberjaya), 300 MW, Cyberjaya, Malaysia · operational
- Google Cloud Malaysia AI Data Center (Elmina), 300 MW, Elmina, Malaysia · under construction
- Microsoft Malaysia AI Cloud, 300 MW, Kuala_Lumpur, Malaysia · operational
- ByteDance Johor AI Data Center, 110 MW, Kulai, Malaysia · operational
- Digital Realty Cyberjaya (Malaysia), 32 MW, Cyberjaya, Malaysia · operational
- Oracle Malaysia Region, Kulai, Malaysia · operational
- DayOne Nusajaya, Malaysia · operational
Frequently asked questions
- What is DayOne Kempas?
- DayOne Kempas is an AI data center project in HP79+MP, Malaysia tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- How big is DayOne Kempas?
- Data Center Index tracks DayOne Kempas at 422 MW, on an estimated $12.2B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- When will DayOne Kempas come online?
- DayOne Kempas is already operating. The next building is expected to go live October 1, 2026.