Bridge Data Centres MY06

243 MW AI data center in Sedenak, Malaysia: operational.

Updated

Bridge Data Centres MY06 is a 243 MW AI data center project located in Sedenak, Malaysia, currently operational. It was developed by Bridge Data Centres for tenant ByteDance. The estimated build cost is $9.2B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Malaysia.

Notes

Users: ByteDance; Epoch 'Current power' = 243 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI

Public companies linked to Bridge Data Centres MY06

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is Bridge Data Centres MY06?
Bridge Data Centres MY06 is an AI data center project in Sedenak, Malaysia tracked by Data Center Index. Its status is operational.
Where is Bridge Data Centres MY06?
Bridge Data Centres MY06 is in Sedenak, Malaysia.
How big is Bridge Data Centres MY06?
Data Center Index tracks Bridge Data Centres MY06 at 243 MW, on an estimated $9.2B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building Bridge Data Centres MY06?
Bridge Data Centres is developing Bridge Data Centres MY06, with ByteDance named as the tenant.
Which public companies are linked to Bridge Data Centres MY06?
Data Center Index links 2 tracked public companies to Bridge Data Centres MY06: ByteDance (BYTEDANCE), ByteDance (BYTEDANCE). Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Bridge Data Centres and ByteDance celebrate grand opening of the first phase hyperscale data centre (MY06) in Johor, Malaysia (mida.gov.my · press · 2022-10-20)