Bridge Data Centres MY06
243 MW AI data center in Sedenak, Malaysia: operational.
Updated
- Capacity: 243 MW
- Location: Sedenak, Malaysia
- Developer: Bridge Data Centres
- Tenant: ByteDance
- Status: operational
- Estimated cost: $9.2B
Bridge Data Centres MY06 is a 243 MW AI data center project located in Sedenak, Malaysia, currently operational. It was developed by Bridge Data Centres for tenant ByteDance. The estimated build cost is $9.2B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Malaysia.
Notes
Users: ByteDance; Epoch 'Current power' = 243 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to Bridge Data Centres MY06
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- ByteDance (BYTEDANCE), developer · hyperscaler
- ByteDance (BYTEDANCE), tenant · hyperscaler
Related data center projects
- ByteDance Johor AI Data Center, 110 MW, Kulai, Malaysia · operational
- DayOne Kempas, 422 MW, Kempas, Malaysia · operational
- AWS Malaysia Cloud Region (Cyberjaya), 300 MW, Cyberjaya, Malaysia · operational
- Google Cloud Malaysia AI Data Center (Elmina), 300 MW, Elmina, Malaysia · under construction
- Microsoft Malaysia AI Cloud, 300 MW, Kuala_Lumpur, Malaysia · operational
- YTL Johor, 284 MW, YTL Green Data Centers, Malaysia · operational
- Digital Realty Cyberjaya (Malaysia), 32 MW, Cyberjaya, Malaysia · operational
- Oracle Malaysia Region, Kulai, Malaysia · operational
Frequently asked questions
- What is Bridge Data Centres MY06?
- Bridge Data Centres MY06 is an AI data center project in Sedenak, Malaysia tracked by Data Center Index. Its status is operational.
- Where is Bridge Data Centres MY06?
- Bridge Data Centres MY06 is in Sedenak, Malaysia.
- How big is Bridge Data Centres MY06?
- Data Center Index tracks Bridge Data Centres MY06 at 243 MW, on an estimated $9.2B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Bridge Data Centres MY06?
- Bridge Data Centres is developing Bridge Data Centres MY06, with ByteDance named as the tenant.
- Which public companies are linked to Bridge Data Centres MY06?
- Data Center Index links 2 tracked public companies to Bridge Data Centres MY06: ByteDance (BYTEDANCE), ByteDance (BYTEDANCE). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Bridge Data Centres and ByteDance celebrate grand opening of the first phase hyperscale data centre (MY06) in Johor, Malaysia (mida.gov.my · press · 2022-10-20)