EdgeConneX HOU01 Houston
AI data center in Houston, TX, United States: operational.
Updated
- Location: Houston, TX, United States
- Developer: EdgeConneX
- Status: operational
EdgeConneX HOU01 Houston is an AI data center project located in Houston, TX, United States, currently operational. It was developed by EdgeConneX. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Texas.
Project description
The page lists a 91,400 sq ft facility with 17,700 sq ft of raised floor, cloud on-ramps and power of up to 30 kW per rack. The page shows the site live; it gives no street address and no MW figure.
Related data center projects
- EdgeConneX Jakarta Campus (Cikarang), 200 MW, Cikarang, Indonesia · operational
- EdgeConneX Santiago Campus (Colina), 61 MW, Colina, Chile · operational
- EdgeConneX Dublin Campus (Grange Castle), 32 MW, Clondalkin, Ireland · operational
- EdgeConneX ATL01-ATL02 Atlanta, 16 MW, Atlanta, GA, United States · operational
- EdgeConneX New Albany Campus, New Albany, OH, United States · under construction
- EdgeConneX Cedar Creek Campus, Bastrop County, TX, United States · under construction
- EdgeConneX Ashville Campus, Ashville, OH, United States · paused
- EdgeConneX Douglas County Campus (Liberty Road), Villa Rica, GA, United States · cancelled
Frequently asked questions
- What is EdgeConneX HOU01 Houston?
- EdgeConneX HOU01 Houston is an AI data center project in Houston, Texas tracked by Data Center Index. Its status is operational.
- Where is EdgeConneX HOU01 Houston?
- EdgeConneX HOU01 Houston is in Houston, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- Who is building EdgeConneX HOU01 Houston?
- EdgeConneX is developing EdgeConneX HOU01 Houston.
Sources
- Houston Data Center | EdgeConneX (edgeconnex.com · press · 2026-11-18)