Saudi Arabia Data Centers
Live tracking of every data center project in Saudi Arabia (operational, under construction, announced, and permitted) with developer, tenant, capacity, and supply-chain links.
- Operating: 1
- Under construction: 2
- Announced: 0
- Operating capacity: 50 MW
- Pipeline capacity: 2 GW
Data Center Index tracks 3 named data center campuses in Saudi Arabia (large sites with a source, not every building): 1 operating, 2 under construction, and 0 announced or permitted. The pipeline adds up to 2 GW of planned capacity. Below: every tracked project in Saudi Arabia, ranked by build status, followed by the public companies whose data center revenue is most exposed to this market.
Tracked data center projects in Saudi Arabia
- stc Cloud Saudi Arabia AI Data Centers, 200 MW, Riyadh · operational · developer: Saudi Telecom Company (stc)
- Aramco Digital & Groq Inference Data Center (Saudi Arabia), 50 MW, Dammam · operational · developer: Aramco Digital
- KAUST Shaheen III Supercomputer, 35 MW, Thuwal · operational · developer: King Abdullah University of Science and Technology (KAUST)
- NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia), 1.5 GW, Oxagon · under construction · developer: DataVolt
- Hexagon Data Center, Riyadh, 480 MW, Riyadh · under construction · developer: SDAIA (Saudi Data & AI Authority)
- Humain AI Data Centers (Saudi Arabia), 200 MW, Riyadh · under construction · developer: Humain
- Microsoft Azure Saudi Arabia East (Dammam), 100 MW, Dammam · announced · developer: Microsoft
Frequently asked questions
- How many data centers are in Saudi Arabia?
- Data Center Index tracks 3 named data center campuses in Saudi Arabia as of 2026: 1 operating, 2 under construction, and 0 announced or permitted. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Saudi Arabia have?
- 50 MW is operating, with 2 GW in the announced and under-construction pipeline. Of the 7 Saudi Arabia campuses with a capacity figure, 0 are filed, 2 stated and 5 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.". Filed and stated figures carry the date of the newest source behind them.
- What is the largest data center in Saudi Arabia?
- NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia) in Oxagon is the largest tracked campus in Saudi Arabia at 1.5 GW, developed by DataVolt. The developer or the press states that capacity, in a source dated August 31, 2026.
- Who is building data centers in Saudi Arabia?
- Developers with a tracked campus in Saudi Arabia include Saudi Telecom Company (stc), Aramco Digital, King Abdullah University of Science and Technology (KAUST). Every campus page lists its developer, tenant and the source that names them.
Public companies exposed to Saudi Arabia
These public companies have tracked data-center projects in Saudi Arabia as developers, tenants, or operators. Use the watchlist to compare them side by side, or click through for capex history and supplier exposure.
- Advanced Micro Devices (AMD), semiconductor · 1 project in Saudi Arabia
- Amazon (AMZN), hyperscaler · 1 project in Saudi Arabia
- Microsoft (MSFT), hyperscaler · 1 project in Saudi Arabia
- Prysmian Group (PRYMF), power equipment · 1 project in Saudi Arabia
- Super Micro Computer (SMCI), it hardware · 1 project in Saudi Arabia
Other data center markets
Other tracked countries, ranked by pipeline capacity:
- China data centers, 9 tracked projects
- France data centers, 7 tracked projects, 2.3 GW pipeline
- Germany data centers, 6 tracked projects, 120 MW pipeline
- Australia data centers, 5 tracked projects, 673 MW pipeline
- Norway data centers, 5 tracked projects, 470 MW pipeline
- Canada data centers, 4 tracked projects, 9.2 GW pipeline
- South Korea data centers, 4 tracked projects, 4 GW pipeline
- India data centers, 4 tracked projects, 1.6 GW pipeline
- Thailand data centers, 4 tracked projects, 789 MW pipeline
- Japan data centers, 4 tracked projects, 750 MW pipeline