KAUST — Shaheen III Supercomputer
35 MW AI data center in Thuwal, Saudi Arabia — operational.
- Capacity: 35 MW
- Location: Thuwal, Saudi Arabia
- Developer: King Abdullah University of Science and Technology (KAUST)
- Status: operational
- Energy source: Mixed
KAUST — Shaheen III Supercomputer is a 35 MW AI data center project located in Thuwal, Saudi Arabia, currently operational. It is being built by King Abdullah University of Science and Technology (KAUST). The site draws on a mix of power sources. This project is one of thousands of data-center facilities tracked by Data Center Index across Saudi Arabia — covering operational, under-construction, announced, and permitted sites.
Related data center projects
- NEOM Oxagon — AI Data Center Campus — 1.5 GW, Oxagon, Saudi Arabia · announced
- NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia) — 1.5 GW, Oxagon, Saudi Arabia · announced
- Aramco Digital & Groq Inference Data Center (Saudi Arabia) — 500 MW, Riyadh, Saudi Arabia · announced
- Hexagon Data Center — Riyadh — 480 MW, Riyadh, Saudi Arabia · under construction
- Humain AI Data Centers (Saudi Arabia) — 200 MW, Riyadh, Saudi Arabia · under construction
- stc Cloud — Saudi Arabia AI Data Centers — 200 MW, Riyadh, Saudi Arabia · operational
- Microsoft Azure — Saudi Arabia East (Dammam) — 100 MW, Dammam, Saudi Arabia · announced