Ireland AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 5
- Operating: 5
- Total capacity: 1.4 GW
Ireland has 5 tracked AI data center projects — 5 operating, 0 under construction, and 0 announced or permitted. Together they represent 1.4 GW of capacity. Developers active here include Amazon Web Services, Microsoft, Meta, Google, Pure Data Centre Group. Each project below links to a detail page with developer, tenant, capacity, timeline, and the public supply-chain companies exposed to the build.
-
Amazon Web Services — EU-WEST-1 Dublin Region — 450 MW, Dublin, Ireland · developer: Amazon Web Services · operational
-
Microsoft Azure — North Europe Region (Dublin) — 350 MW, Dublin, Ireland · developer: Microsoft · operational
-
Meta — Clonee AI Data Center Campus — 288 MW, Clonee, Ireland · developer: Meta · operational
-
Google — Dublin AI Data Center Campus — 250 MW, Dublin, Ireland · developer: Google · operational
-
Pure Data Centre — Dublin AI Microgrid — 110 MW, Dublin, Ireland · developer: Pure Data Centre Group · operational