QTS Cambois Data Centre Campus
720 MW AI data center in Cambois, United Kingdom: under construction.
- Capacity: 720 MW
- Location: Cambois, United Kingdom
- Developer: QTS Data Centers (Blackstone)
- Status: under construction
QTS Cambois Data Centre Campus is a 720 MW AI data center project located in Cambois, United Kingdom, currently under construction. It is being built by QTS Data Centers (Blackstone). This project is one of thousands of data-center facilities tracked by Data Center Index across United Kingdom, covering operational, under-construction, announced, and permitted sites.
Project description
QTS, the Blackstone-owned developer, is building a campus of up to 10 data centre buildings on the former Blyth Power Station site at Cambois in Northumberland, a project valued at about £10 billion. Zayo said in March 2026 that the site will support up to 720 MW when fully built.
Related data center projects
- Elsham Tech Park, 1 GW, Elsham, United Kingdom · permitted
- Microsoft Azure UK South Region (London), 500 MW, London, United Kingdom · operational
- DataVita North Lanarkshire AI Growth Zone Campus, 500 MW, North Lanarkshire, United Kingdom · operational
- Rolls-Royce SMR-Powered Data Center Initiative, 470 MW, London, United Kingdom · announced
- Amazon Web Services EU-WEST-2 London Region, 400 MW, London, United Kingdom · operational
- Humber Tech Park, 386 MW, South Killingholme, United Kingdom · permitted
- Equinix Hertfordshire Campus (South Mimms), 250 MW, South Mimms, United Kingdom · permitted
- CoreWeave UK AI Data Centers (London & Manchester), 150 MW, London, United Kingdom · operational
Frequently asked questions
- What is QTS Cambois Data Centre Campus?
- QTS Cambois Data Centre Campus is an AI data center project in Cambois, United Kingdom tracked by Data Center Index. Its status is under construction.
- Where is QTS Cambois Data Centre Campus?
- QTS Cambois Data Centre Campus is in Cambois, United Kingdom.
- How big is QTS Cambois Data Centre Campus?
- Data Center Index tracks QTS Cambois Data Centre Campus at 720 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building QTS Cambois Data Centre Campus?
- QTS Data Centers (Blackstone) is developing QTS Cambois Data Centre Campus.
- When will QTS Cambois Data Centre Campus come online?
- The next building at QTS Cambois Data Centre Campus is expected online 2028. That date is the first building going live, not the full build-out.
Sources
- Zayo Europe connects UK's largest AI data centre (advanced-television.com · press · 2026-03-23)
- Enabling works start on £10bn UK data centre campus (constructionbriefing.com · press · 2025-11-13)
- Corgan (project architect) (corgan.com · press · 2026-03-23)