Nebraska Mega-Campus
2.7 GW AI data center in Lincoln, NE, United States — announced.
- Capacity: 2.7 GW
- Location: Lincoln, NE, United States
- Developer: Google
- Status: announced
- Energy source: Reported private combined-cycle natural gas plant with carbon capture
Nebraska Mega-Campus is a 2.7 GW AI data center project located in Lincoln, NE, United States, currently announced. It is being built by Google. Power for the facility is sourced from Reported private combined-cycle natural gas plant with carbon capture. This project is one of thousands of data-center facilities tracked by Data Center Index across NE, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Google's proposed mega-campus near Lincoln, Nebraska is tracked at 2,700 MW with a 2026 start. Reporting points to a private combined-cycle natural gas supply for the site, which would make it one of the largest hyperscale proposals in the Midwest.
Public companies linked to Nebraska Mega-Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
- Alphabet (GOOGL) — tenant · hyperscaler
Related data center projects
- Goodnight — 1.3 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · operational
- EcoDataCenter 1 — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google New Albany — 543 MW, New Albany, OH, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, TN, United States · announced
- Google Omaha — 474 MW, Omaha, NE, United States · operational