AWS Mississippi Campus
650 MW AI data center in Canton, MS, United States — under construction.
- Capacity: 650 MW
- Location: Canton, MS, United States
- Developer: AWS
- Status: under construction
- Estimated cost: $16.0B
- Energy source: Mixed (Grid with renewable projects)
AWS Mississippi Campus is a 650 MW AI data center project located in Canton, MS, United States, currently under construction. It is being built by AWS. The estimated build cost is $16.0B. Power for the facility is sourced from Mixed (Grid with renewable projects). This project is one of thousands of data-center facilities tracked by Data Center Index across MS, United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to AWS Mississippi Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Amazon (AMZN) — developer · hyperscaler
- Trane Technologies (TT) — hvac · cooling · high DC exposure
- Micron Technology (MU) — memory supplier · chip fab · high DC exposure
- SK Hynix (000660.KS) — memory supplier · chip fab · high DC exposure
Related data center projects
- Project Rainier — 2.2 GW, New Carlisle, IN, United States · operational
- AWS Pennsylvania Campus — 1.8 GW, Salem Township, PA, United States · under construction
- AWS Ohio Campus — 1.3 GW, Jefferson Township, OH, United States · announced
- AWS North Carolina Campus — 1.0 GW, Richmond County, NC, United States · under construction
- AWS Northern Virginia — 770 MW, Loudoun County, VA, United States · under construction
- AWS Oregon Expansion — 576 MW, Boardman, OR, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction