AWS Mississippi Campus
650 MW AI data center in Canton, MS, United States — under construction.
- Capacity: 650 MW
- Location: Canton, MS, United States
- Developer: AWS
- Status: under construction
- Estimated cost: $16.0B
- Energy source: Mixed (Grid with renewable projects)
AWS Mississippi Campus is a 650 MW AI data center project located in Canton, MS, United States, currently under construction. It is being built by AWS. The estimated build cost is $16.0B. Power for the facility is sourced from Mixed (Grid with renewable projects). This project is one of thousands of data-center facilities tracked by Data Center Index across MS, United States — covering operational, under-construction, announced, and permitted sites.
Project description
AWS's Canton, Mississippi campus is a $16 billion build tracked at 650 MW, under construction since 2024 for training and inference. SK Hynix, Micron and Trane are linked alongside Amazon.
Public companies linked to AWS Mississippi Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Amazon (AMZN) — developer · hyperscaler
- Trane Technologies (TT) — hvac · cooling · high DC exposure
- Micron Technology (MU) — memory supplier · chip fab · high DC exposure
- SK Hynix (000660.KS) — memory supplier · chip fab · high DC exposure
Related data center projects
- Project Rainier — 2.2 GW, New Carlisle, IN, United States · operational
- AWS Pennsylvania Campus — 1.8 GW, Salem Township, PA, United States · under construction
- AWS Ohio Campus — 1.3 GW, Jefferson Township, OH, United States · announced
- AWS North Carolina Campus — 1.0 GW, Richmond County, NC, United States · under construction
- AWS Northern Virginia — 770 MW, Loudoun County, VA, United States · under construction
- AWS Oregon Expansion — 576 MW, Boardman, OR, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction