IXcellerate Veshki Campus
130 MW AI data center in Veshki, Russia: under construction.
- Capacity: 130 MW
- Location: Veshki, Russia
- Developer: IXcellerate
- Status: under construction
IXcellerate Veshki Campus is a 130 MW AI data center project located in Veshki, Russia, currently under construction. It is being built by IXcellerate. This project is one of thousands of data-center facilities tracked by Data Center Index across Russia, covering operational, under-construction, announced, and permitted sites.
Project description
IXcellerate bought a 5.5 ha plot near Veshki in the Mytishchi district, 6 km from its North campus, and began building its third campus: 7,500 racks and over 130 MW across MOS11 and MOS12. MOS11 (2,500 racks, 40 MW) is going into a former hypermarket, with its first phase scheduled for summer 2026.
Related data center projects
- IXcellerate Moscow South Campus, 300 MW, Moscow, Russia · operational
- IXcellerate Moscow North Campus, Moscow, Russia · operational
- Sberbank Balakovo AI Data Center, 82 MW, Balakovo, Russia · under construction
- Yandex Kaluga Data Center, 63 MW, Kaluga, Russia · operational
- Rostelecom Udomlya Data Center, 48 MW, Udomlya, Russia · operational
- Yandex Vladimir Data Center, 40 MW, Vladimir, Russia · operational
- Rostelecom Medvedkovo Data Center, 36 MW, Moscow, Russia · operational
- MTS Avantazh Data Center, 20 MW, Lytkarino, Russia · operational
Frequently asked questions
- What is IXcellerate Veshki Campus?
- IXcellerate Veshki Campus is an AI data center project in Veshki, Russia tracked by Data Center Index. Its status is under construction.
- Where is IXcellerate Veshki Campus?
- IXcellerate Veshki Campus is in Veshki, Russia.
- How big is IXcellerate Veshki Campus?
- Data Center Index tracks IXcellerate Veshki Campus at 130 MW. The developer or the press states that capacity, in a source dated November 24, 2025.
- Who is building IXcellerate Veshki Campus?
- IXcellerate is developing IXcellerate Veshki Campus.
Sources
- IXcellerate expands its presence in the Moscow Region with the launch of new 130 MW campus (ixcellerate.com · press · 2025-11-24)
- IXcellerate (ixcellerate.com · press · 2025-11-24)