Huawei Wuhu
457 MW AI data center in Wuhu, China: operational.
- Capacity: 457 MW
- Location: Wuhu, China
- Developer: Huawei
- Status: operational
- Estimated cost: $7.5B
Huawei Wuhu is a 457 MW AI data center project located in Wuhu, China, currently operational. It is being built by Huawei. The estimated build cost is $7.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across China, covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 199 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- Huawei Cloud Guizhou AI Data Center, 400 MW, Guiyang, China · operational
- Huawei Horinger, 184 MW, China · operational
- Huawei Cloud Europe Region (Frankfurt, Germany), 50 MW, Frankfurt, Germany · operational
- Envision Galaxy Ulanqab, 2 GW, Ulanqab, China · operational
- VNET Bayin Ulanqab, 1.2 GW, Ulanqab, China · operational
- Tencent Tianjin AI Data Center (China), 300 MW, Tianjin, China · operational
- Alibaba Zhangbei, 169 MW, Zhangbei, China · operational
- ByteDance Volcengine Inner Mongolia AI Training Cluster, 100 MW, Horinger, China · operational
Frequently asked questions
- What is Huawei Wuhu?
- Huawei Wuhu is an AI data center project in Wuhu, China tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is Huawei Wuhu?
- Huawei Wuhu is in Wuhu, China.
- How big is Huawei Wuhu?
- Data Center Index tracks Huawei Wuhu at 457 MW, on an estimated $7.5B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Huawei Wuhu?
- Huawei is developing Huawei Wuhu.
- When will Huawei Wuhu come online?
- Huawei Wuhu is already operating. The next building is expected to go live December 31, 2026.
Sources
- Xinhua (news.cn · press · 2024-06-14)
- Economic Information Daily (jjckb.cn · press · 2024-06-14)