Huawei Horinger
184 MW AI data center in China: operational.
Updated
- Capacity: 184 MW
- Location: China
- Developer: Huawei
- Status: operational
- Estimated cost: $6.4B
Huawei Horinger is a 184 MW AI data center project located in China, currently operational. It was developed by Huawei. The estimated build cost is $6.4B. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in China.
Notes
Epoch 'Current power' = 170 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- Huawei Wuhu, 453 MW, Wuhu, China · operational
- Huawei Cloud Guizhou AI Data Center, 400 MW, Guiyang, China · operational
- Huawei Cloud Europe Region (Frankfurt, Germany), 50 MW, Frankfurt, Germany · operational
- Envision Galaxy Ulanqab, 2 GW, Ulanqab, China · operational
- VNET Bayin Ulanqab, 1.2 GW, Ulanqab, China · operational
- Tencent Tianjin AI Data Center (China), 300 MW, Tianjin, China · operational
- Alibaba Zhangbei, 169 MW, Zhangbei, China · operational
- ByteDance Volcengine Inner Mongolia AI Training Cluster, 100 MW, Horinger, China · operational
Frequently asked questions
- What is Huawei Horinger?
- Huawei Horinger is an AI data center project in China tracked by Data Center Index. Its status is operational, and it is still adding buildings.
- Where is Huawei Horinger?
- Huawei Horinger is in China.
- How big is Huawei Horinger?
- Data Center Index tracks Huawei Horinger at 184 MW, on an estimated $6.4B build. 242 MW of that is live today. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Huawei Horinger?
- Huawei is developing Huawei Horinger.
- When will Huawei Horinger come online?
- Huawei Horinger is already operating. The next building is expected to go live December 22, 2026.
Sources
- China Daily (regional.chinadaily.com.cn · press · 2023-10-11)
- Huawei Horinger | AI Data Centers (epoch.ai · aggregator · 2026-09-11)