Vultr
Tracked AI data center portfolio for Vultr: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 75 MW
Projects
- 5C Springfield AI Data Center (Vultr), 75 MW, Springfield, OH, United States · under construction
Frequently asked questions
- How many data centers does Vultr have?
- Data Center Index tracks 1 data center campus with Vultr named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Vultr have?
- 75 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Vultr campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Vultr build data centers?
- Tracked Vultr campuses sit in 1 market: OH (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Vultr data center?
- 5C Springfield AI Data Center (Vultr) in OH is the largest tracked Vultr campus at 75 MW, currently under construction. The developer or the press states that capacity, in a source dated August 14, 2026.