How many data centers does Start Campus have?
Data Center Index tracks 1 data center campus with Start Campus named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Start Campus have?
1.2 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Start Campus campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Start Campus build data centers?
Tracked Start Campus campuses sit in 1 market: Portugal (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Start Campus data center?
Start Campus Sines Data Campus in Portugal is the largest tracked Start Campus campus at 1.2 GW, currently operational. The developer or the press states that capacity, in a source dated May 6, 2026.