- Projects tracked: 1
- Total pipeline: 58 MW
Projects
- Nebius & Mega Or Israel AI Hub, 58 MW, Beit Shemesh, Israel · under construction
Frequently asked questions
- How many data centers does Nebius & Mega Or have?
- Data Center Index tracks 1 data center campus with Nebius & Mega Or named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Nebius & Mega Or have?
- 58 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Nebius & Mega Or campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Nebius & Mega Or build data centers?
- Tracked Nebius & Mega Or campuses sit in 1 market: Israel (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Nebius & Mega Or data center?
- Nebius & Mega Or Israel AI Hub in Beit Shemesh, Israel is the largest tracked Nebius & Mega Or campus at 58 MW, currently under construction. The developer or the press states that capacity, in a source dated September 12, 2026.