GSA (Gulf/Singtel/AIS)
Tracked AI data center portfolio for GSA (Gulf/Singtel/AIS): live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 35 MW
Projects
- Microsoft Thailand AI Data Center, 35 MW, Chonburi, Thailand · under construction
Frequently asked questions
- How many data centers does GSA (Gulf/Singtel/AIS) have?
- Data Center Index tracks 1 data center campus with GSA (Gulf/Singtel/AIS) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does GSA (Gulf/Singtel/AIS) have?
- 35 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 GSA (Gulf/Singtel/AIS) campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does GSA (Gulf/Singtel/AIS) build data centers?
- Tracked GSA (Gulf/Singtel/AIS) campuses sit in 1 market: Thailand (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest GSA (Gulf/Singtel/AIS) data center?
- Microsoft Thailand AI Data Center in Chonburi, Thailand is the largest tracked GSA (Gulf/Singtel/AIS) campus at 35 MW, currently under construction. The developer or the press states that capacity, in a source dated March 18, 2025.