Digital Edge
Tracked AI data center portfolio for Digital Edge: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 500 MW
Projects
- Digital Edge CGK AI Mega Campus, 500 MW, Bekasi, Indonesia · under construction
Frequently asked questions
- How many data centers does Digital Edge have?
- Data Center Index tracks 1 data center campus with Digital Edge named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Digital Edge have?
- 500 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Digital Edge campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Digital Edge build data centers?
- Tracked Digital Edge campuses sit in 1 market: Indonesia (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Digital Edge data center?
- Digital Edge CGK AI Mega Campus in Bekasi, Indonesia is the largest tracked Digital Edge campus at 500 MW, currently under construction. The developer or the press states that capacity, in a source dated September 12, 2026.